Herbst Datentechnik GmbH
AS43503 · Herbst
Tools: Where can I peer with Herbst Datentechnik GmbH? · Where should Herbst Datentechnik GmbH peer next? · Compare Herbst Datentechnik GmbH with another network
This network elsewhere: its registry history on RIR Tracker · its routes on BGP Report
PeeringDB fix list Printable page · CSV
One thing to fix in Herbst Datentechnik GmbH's PeeringDB record, from what its exchanges publish: 1 to correct. As of 2026-11-19 12:40 UTC.
Make the changes on Herbst Datentechnik GmbH's PeeringDB page: sign in, choose Edit, and find the exchanges under Public Peering Exchange Points. Speeds go in as megabits per second.
Correct these entries (1)
Addresses or port speeds in PeeringDB that differ from the exchange's IX-F export. The changes below follow the export; if the export is the one that's wrong, tell the exchange instead.
-
Problem PeeringDB has The export has Port speed differs 1G 2G - In the entry with IPv4 193.178.185.21: set Speed to 2000 (2G) (now 1000).
PeeringDB's IX-F import is on for this exchange, so PeeringDB also suggests this change on the network's PeeringDB page.
Exchanges over time
Show as a table
| Date | Exchanges |
|---|---|
| Nov 19, 2026 | 1 |
| Nov 18, 2026 | 1 |
| Nov 17, 2026 | 1 |
| Nov 16, 2026 | 1 |
| Nov 15, 2026 | 1 |
| Nov 14, 2026 | 1 |
| Nov 13, 2026 | 1 |
| Nov 12, 2026 | 1 |
| Nov 11, 2026 | 1 |
| Nov 10, 2026 | 1 |
| Nov 9, 2026 | 1 |
| Nov 8, 2026 | 1 |
| Nov 7, 2026 | 1 |
| Nov 6, 2026 | 1 |
| Nov 5, 2026 | 1 |
| Nov 4, 2026 | 1 |
| Nov 3, 2026 | 1 |
| Nov 2, 2026 | 1 |
| Nov 1, 2026 | 1 |
| Oct 31, 2026 | 1 |
| Oct 30, 2026 | 1 |
| Oct 29, 2026 | 1 |
| Oct 28, 2026 | 1 |
| Oct 27, 2026 | 1 |
| Oct 26, 2026 | 1 |
| Oct 25, 2026 | 1 |
| Oct 24, 2026 | 1 |
| Oct 23, 2026 | 1 |
| Oct 22, 2026 | 1 |
| Oct 21, 2026 | 1 |
| Oct 20, 2026 | 1 |
| Oct 19, 2026 | 1 |
| Oct 18, 2026 | 1 |
| Oct 17, 2026 | 1 |
| Oct 16, 2026 | 1 |
| Oct 15, 2026 | 1 |
| Oct 14, 2026 | 1 |
| Oct 13, 2026 | 1 |
| Oct 12, 2026 | 1 |
| Oct 11, 2026 | 1 |
| Oct 10, 2026 | 1 |
| Oct 9, 2026 | 1 |
| Oct 8, 2026 | 1 |
| Oct 7, 2026 | 1 |
| Oct 6, 2026 | 1 |
| Oct 5, 2026 | 1 |
| Oct 4, 2026 | 1 |
| Oct 3, 2026 | 1 |
Map
Where Herbst Datentechnik GmbH's exchanges are, colored by how PeeringDB and each exchange's own list compare, and the buildings it lists in PeeringDB, marked where it could peer on an exchange it isn't on yet.
| BCIX Berlin, Germany | 1G | Both Speed differs |
These exchanges have a switch in a facility where Herbst Datentechnik GmbH lists itself in PeeringDB, but don't have Herbst Datentechnik GmbH as a member in PeeringDB, their IX-F export or their website. Joining one is usually just a cross-connect away. The biggest exchanges come first; ghost exchanges are left out.
| NL-ixAmsterdam, Rotterdam, Brussels, Luxembourg, Frankfurt, Düsseldorf, Berlin, Dublin, London, Copenhagen, Paris, Marseille, Netherlands | 672 | |
| MegaIX BerlinBerlin, Germany | 43 | |
| Community-IXBerlin, Frankfurt, Germany | 25 | |
| Global Peer ExchangeWashington, United States | 6 |
Facilities (2)
The buildings Herbst Datentechnik GmbH lists in PeeringDB, and how many of the exchanges in each it's on.
| CarrierColo Berlin Luetzow (I/P/B/ site B)Berlin | 1 of 5 | |
| NTT Berlin 1 Data Center (BER1)Berlin | 1 of 4 |